Office construction and tenant improvements

Corporate interiors, spec suites and full-floor fit-outs delivered against your lease commencement date and your landlord's building rules.

Office corridor with glass-partition meeting rooms after a tenant build-out

Office space built around your lease date.

Office projects are measured against lease dates and building rules. Rent starts, a lease commences or a team needs to move in. Carlson Construction plans every office project backward from that date and coordinates early with the landlord, property manager and building engineer.

In occupied buildings, we plan around neighboring tenants with after-hours work, protected paths of travel and noise and dust controls agreed in advance with building management.

Finished open-plan office with glass-walled meeting rooms and polished concrete floors

What our office construction scope includes.

Landlord coordination

Work letters, building rules, insurance certificates and approvals managed with the property manager from day one.

Demolition and preparation

Selective demolition and existing-condition surveys of space being repurposed for a new tenant.

Interior construction

Framing, drywall, ceilings, doors, millwork and finishes built to your design and the building standard.

MEP and life safety

HVAC, electrical, plumbing, fire alarm and sprinkler modifications coordinated with base-building systems.

After-hours and phased work

Noisy or disruptive activity scheduled outside business hours to keep neighboring tenants operating.

Move-in coordination

Sequencing with your furniture, cabling and AV vendors so move-in happens on schedule.

How it works.

Survey

We walk the space with your team and the building engineer to confirm existing conditions.

Price

A detailed proposal based on your drawings and the landlord work letter.

Build

Phased construction planned around building rules and neighboring tenants.

Turn over

Inspections, punch list and a space ready for furniture and move-in.

Typical office construction projects.

Tenant improvements
Spec suites
Full-floor fit-outs
Headquarters build-outs
Conference and amenity spaces
Lobby and common-area renovations

Also see: Commercial general contracting

Office construction questions.

More answers in our FAQs

Can you build out a suite while the rest of the building is occupied?

Yes. We schedule noisy and disruptive work outside business hours, protect common areas and paths of travel, and agree on dust, noise and access controls with building management before mobilizing.

Do you work within our landlord's work letter and building rules?

Yes. We review the work letter, building standards and contractor rules before pricing, and coordinate approvals, insurance and access with the property manager throughout the project.

How long does an office build-out take?

Duration depends on size, permitting and long-lead items such as HVAC equipment or glass partitions. We provide a schedule with your proposal and flag any long-lead items that could affect your move-in date.