Restaurant construction

Kitchen and dining build-outs for operators and franchise groups, with health, fire and brand-standard inspections scheduled well ahead of opening.

Restaurant dining room with pendant lighting, exposed ductwork and patterned tile floor

Opening dates depend on inspections. We plan for them first.

A restaurant opening depends on health department, fire marshal and brand-standard inspections lining up with the date you have announced. We coordinate kitchen equipment, hoods, grease interceptors and front-of-house finishes so each inspection is scheduled well ahead of opening.

For franchise groups, we build to your prototype drawings and brand standards and keep your construction manager updated with the same weekly reporting every Carlson client receives.

Finished restaurant dining room with timber tables and warm lighting

What our restaurant construction scope includes.

Kitchen build-outs

Kitchen layouts, equipment rough-ins, walk-in coolers and finishes built to your equipment schedule.

Hoods and ventilation

Exhaust hoods, make-up air and fire suppression coordinated with the mechanical design and the fire marshal.

Plumbing and grease management

Floor drains, grease interceptors and fixtures installed to health department requirements.

Front of house

Dining rooms, bars, restrooms and finishes delivered to your design or brand standards.

Franchise prototypes

Build-outs to franchisor drawings and standards, with reporting your construction manager can follow.

Inspections and opening

Health, building and fire inspections scheduled ahead of your opening date.

How it works.

Review

Drawings, equipment schedule and brand standards are reviewed with your team.

Price

A line-item proposal with equipment and long-lead items identified.

Build

Kitchen and front-of-house work sequenced around inspections.

Open

Final inspections, punch list and a space ready for training and opening.

Typical restaurant construction projects.

Full-service restaurants
Quick-service and franchise build-outs
Commercial kitchens
Bars and taprooms
Cafes and bakeries
Second-generation restaurant conversions

Also see: Commercial general contracting

Restaurant construction questions.

More answers in our FAQs

Do you build to franchise brand standards?

Yes. We build to your prototype drawings and brand standards and share weekly reports with your construction or development manager.

Can you convert a second-generation restaurant space?

Yes. We assess the existing kitchen, hood, grease and plumbing infrastructure before pricing so you know what can be reused and what must be replaced.

How do you keep a restaurant opening date on track?

We work backward from the opening date, identify long-lead equipment early and schedule health, building and fire inspections well before opening so there is time to address any comments.

Ready to talk through your project?

Share the basics and a project lead will follow up within one business day to schedule a site walk.

Scroll to Top